QCFoshan

Home / Before you pay

Paying the balance? Inspect first.

The factory says the order is finished. The photos look fine. They want the remaining 70% today. Once the container is sealed, that money is gone — ocean freight takes four to eight weeks, and by the time a defect reaches your warehouse you cannot return the goods or stop the charges.

$199 one day of furniture inspection in Foshan
$8,000–20,000 one rejected 40HQ — freight, demurrage, return shipping and the goods you already paid for

Five things that must be confirmed before you pay

Most disputes about furniture shipments trace back to one of these. None of them can be settled from photographs.

1. Quantity and SKU mix

Are all models packed in the right ratios? A missing 40 chairs in a 200-piece order is a production problem, not a shipping problem — and you will not find out until the container is opened.

2. Dimensions and specification

Is the table 1800 ± 3 mm, or 1750 mm? Does the chair match the golden sample, or a slightly cheaper variant? Furniture tolerances are written down somewhere. Almost nobody checks them.

3. Workmanship and finish

Scratches, dents, chipped edges, uneven paint, visible weld seams, loose joints. Visible in person, invisible in a photograph taken from one good angle.

4. Packaging that survives the ocean

A 40HQ holds roughly 300 cartons. Goods will be stacked, shaken and exposed to humidity for weeks. Carton drop testing is the only way to know whether the packaging protects them.

5. Safety and function

A chair that wobbles, a table with a loose leg, a sofa frame that fails at 250 lbs. These are the defects that end careers on Amazon and in retail — and the cheapest to catch before shipment.

Why factory photos do not prove quality

Every buyer has received a photo album that looked perfect. Some were genuine. Most were incomplete.

How factory photos get staged

  • One good angle — the sun-facing, cleaned-up, camera-ready corner of the batch. Nobody photographs the other four sides.
  • The pre-production sample — the unit in the photo may be the golden sample, not the batch you paid for.
  • Lighting and filters — a warm filter hides a colour mismatch that will be obvious under your warehouse lights.
  • Newly tidied units — a carton opened for the photo is restacked afterwards. Scratches appear from handling.
  • Selective cartons — 300 cartons in the container, five photographed.

What a photograph physically cannot show

"The chair looks solid"Does the seat hold 300 lbs for 60 minutes?
"Looks stable"Does it tip at a 10-degree tilt?
"Nice finish"Do all four legs pass the wobble test?
"Cartons look fine"Do they survive a 30-inch drop?
"Wood looks good"Actual moisture content — 12% or 18%?

This is not about accusing your supplier of lying. Most factories are honest and under time pressure. The problem is that a photograph is not evidence, and it never was.

If the inspection fails, you have four options

A failed inspection is not the end of the order. It is the point where you still have leverage.

Option 1 — Factory rework

The factory repairs or replaces defective units, then we re-inspect.

Who pays
The factory
Timeline
2–10 days
Best for
Minor assembly, finish or packaging problems

Option 2 — Sorting and part shipment

Defective units are removed, good units are packed. You receive a partial shipment that passes.

Who pays
Sorting cost usually shared or agreed in advance
Timeline
1–3 days
Note
You still pay for the good units

Option 3 — Replacement batch

The factory produces a fresh batch to replace the failed units.

Who pays
The factory
Timeline
10–30 days
Best for
Critical defects on high-value items

Option 4 — Reject and hold

You decline to ship, or hold the container while the situation is resolved.

Who pays
Contract-dependent; freight and demurrage usually fall on the buyer once goods are loaded
Best for
Systemic failures

What we do: our report states the facts, the defect rate and the AQL result. We do not tell you what to do. The commercial decision is yours — but you will be making it with evidence instead of a factory's reassurance.

Our re-inspection guarantee

If our report states PASS and the goods arrive defective, we re-inspect free of charge and refund the inspection fee.

This is written into our service agreement. It is not a marketing line. Note the scope: our report is an order verification statement, not a product test report, and has no legal standing.

What this does not cover — and we would rather you knew this up front:

Why we can offer this: we charge $199 for a day of work, not a percentage of your order value. We have no financial interest in your shipment being loaded — which is exactly why our inspector is not the factory's employee, and why we take the risk on inspection quality rather than on your cargo value.

Timing: four checkpoints, one already too late

CheckpointStateWhat it catchesCost of finding a problem here
Pre-productionBefore mass productionWrong materials, dimensions, hardwareLowest — change costs almost nothing
Early production20–30% completeWhether the factory is building the right thingLow — hundreds of units left
Mid production50–60% completeProgress, workmanship consistencyMedium — half still fixable
Pre-shipment80–100% packedEverything: quantity, quality, packaging, markingHigh — last chance before loading
After loadingContainer sealedNothing usefulUnrecoverable

The honest truth: a pre-shipment inspection at 95% finished is still highly effective, because 5% of the goods can be reworked and the container is not sealed. An inspection after sealing has no value at all.

If a factory is pressuring you to load immediately and skip inspection, read that as a warning.

A real order

The situation. A European importer of 240 office chairs had paid a 30% deposit. Production was complete. The factory sent 12 photos showing a clean, uniform batch and asked for the balance. Order value: $31,000.

What the photos missed. Our inspector sampled 80 units across the stacks and load-tested them.

FindingRate in sampleGrade
Seat wobble beyond 3 mm26 of 80 (32%)Major
Leg strength failed at 75 lbs9 of 80 (11%)Major
Gas lift without visible certification mark74 of 80 (93%)Critical
Carton drop test failure3 of 5 cartonsCritical

The gas lift was the real problem. Uncertified gas lifts fail without warning, often under load, sometimes injuring someone. In the EU and US this is a liability and a compliance problem, not a quality complaint.

What happened. The report reached the buyer that evening, with photographs and the load-test data. The buyer withheld the balance payment the next morning.

The factory's response. Replaced all uncertified gas lifts (it had no certificates to supply), reworked the 26 wobbly chairs, replaced the failing cartons, and sent photographs of the new gas lift certification.

Re-inspection after 6 days. 80 units re-tested. All wobble failures resolved, gas lifts certified, cartons passed. Report issued: PASS.

What the buyer avoided: shipping a 40HQ of chairs with uncertified gas lifts into an EU market. That single finding would have meant product recall risk, liability exposure and a destroyed customer relationship.

Total cost of the verification: $199 Value of that single finding: the buyer's decision on a $31,000 balance payment

What we need from you

You do not need a formal inspection brief. Send what you have.

Essential

  • Factory name and address
  • Your PI or PO number
  • What is being produced, and how many pieces
  • Inspection date, or "as soon as possible"

Strongly recommended

  • Your approved sample — even photographs help, though a physical sample is better
  • Your specification sheet, drawing, or the supplier's product page
  • Any defect concern you already have — "the last shipment had wobble problems" is useful
  • Carton quantity and packed dimensions, if known

Not needed: a formal written checklist, laboratory test reports, or your supplier's internal QC records.

If you only have a link and a product name, send us that. We will build the inspection criteria for you and tell you what we will check, before we arrive. That scoping conversation is free.

How it works

  1. You send the details. PO, factory address, product, inspection date.
  2. We confirm and assign. We contact the factory and assign an inspector experienced in your product category. Usually within 2 hours.
  3. On site. AQL sampling from across the stacks, physical checks, photo evidence throughout. Findings sent to you on WhatsApp as they happen.
  4. Report within 24 hours. English, with lot size, sample size, AQL accept and reject numbers, every check marked PASS or FAIL, and one clear conclusion.
  5. You decide. Release the balance, request rework, sort, or hold.

$199 per man-day · All-inclusive travel in Guangdong · Report within 24 hours · Free re-check if goods fail after a pass

Send your order details →

Questions buyers ask

1. How much does an order verification cost?

$199 per man-day, all-inclusive: travel within Guangdong, the inspection itself, photographs, and the written report. No weekend or holiday surcharge. Full pricing details →

2. What is the minimum order value you accept?

There is no minimum, but economically a one-man-day inspection makes sense when the shipment risk justifies it. If your order is small, we will tell you honestly whether inspection is worth it.

3. Will you inspect something that is not furniture?

We focus on furniture — sofas, mattresses, beds, dining sets, outdoor, cabinets, hotel and office furniture. If your order is something else, we will refer you to someone who handles it.

4. How long does an inspection take?

One man-day covers a normal shipment. Very large containers or complex testing may need two. We will tell you before booking if your order needs more.

5. Can you inspect before the goods are finished?

Yes. Pre-production and during-production inspections are available and often more cost-effective, because problems found at 20% production cost almost nothing to fix. Same price per man-day.

6. What do you need from me?

Factory address, product and quantity, and a date. If you have an approved sample or specification, send it — it makes a large difference. If you only have a link, send that and we will build the criteria for you.

7. What if the inspection fails?

You get the report with the facts and evidence, and you choose: factory rework, sorting, replacement or holding the shipment. We do not negotiate on your behalf and we take no commission from factories.

8. Do you guarantee the goods will be defect-free?

No. No verification can guarantee that. Our inspection is AQL-based sampling: on a 1,000-piece order we inspect a statistically valid sample, not every unit. What we guarantee is that the report is honest, the evidence is complete, and the judgement follows the agreed standard. If goods that passed our report arrive defective, we re-inspect free and refund the inspection fee.

9. Which city do you cover?

Foshan, Shunde, Dongguan and Shenzhen, within 48 hours of booking. Inspection at your factory, on your schedule — we are not limited to a particular production cluster.

10. Do you charge more if the factory is far away?

Within Guangdong, travel is included in the man-day rate. Beyond Guangdong, travel and accommodation are quoted separately. We will tell you before you commit.

Talk to us directly We reply within 2 hours during business hours (Mon–Sat, 09:00–18:00 China time).
💬 WhatsApp +86 188 7070 7780 Fastest. Send your PI or a product link and we will tell you what we can check. ✉️ wade2024@126.com Better if you have a PI or specification PDF to attach. 📋 See the three levels and prices $149 / $199 / $299 per man-day. What differs between them, item by item.
If your inspection is urgent, WhatsApp is the fastest route.